With a proven history of successful Flood Alleviation Schemes, VolkerGround Engineering was awarded the substantial piling works for the Templeborough to Rotherham Flood Defence works.

This saw the installation of both sheet piles and tubular piles at various locations throughout the region.

This contract was based on a minimum one year programme and as the project evolved so did the sequence of works and programme. Working closely with the Main Contractor meant that any problems with programme (re-mobilisation to alternative locations etc) could be resolved quickly and any costs kept to a minimum for all parties.

Facts and figures

  • Contract value:
    £2,800,000
  • Contract duration:
    12 months
  • Project categories
    Sheet Piling

Learn more about this project?