Land costs dictate that most developments are required to maximise the use of the land available. Sheet pile boundary retaining walls and sheet piled basement car parks are often specified to meet this need.
VolkerGround Engineering has carried out many city centre projects, normally with our leader rigs, the choice of which will be determined by both access constraints and the type of installation required. Where particular situations require alternative methods these will be developed in consultation with our client to ensure that a satisfactory outcome is achieved. Key issues such as design life, waterproofing, fire risk and deflections can all be undertaken by VolkerGround Engineering as part of a design package if required.
Colwyn BayIn January 2011 Volker Stevin were awarded the Colwyn Bay Coastal Defence Project by Client Colwyn Bay Borough Council.... Case details» |
Ramada Hotel, NewcastleVolkerGround Engineering completed the installation of steel sheet piles to form the steel intensive car park basement of... Case details» |
Green Lane, DurhamVolkerGround Engineering completed the installation of steel sheet piles to form the split level car park basement of a new... Case details» |
Basement Carpark, WalkerVolkerGround Engineering carried out the installation of steel sheet piles to form the steel intensive car park basement of a... Case details» |
Baltic PlaceIn September 2006 work commenced on the installation of 11.0m to 18.0m long piles to form the steel intensive basement car... Case details» |